LLDA Clearance (LC) – Online

Refers to the conditional clearance issued by the Authority for developmental plan/program/project of industrial/commercial/agricultural/institutional establishment within Laguna de Bay Region that availed the LLDA Online LC application

Division

 

Clearances and Permits Division

 

Classification

 

Highly technical

 

Type of Transaction G2B-Government to Business, G2G-Government to Government

 

Who May Avail

 

Persons, natural or juridical, with existing and/or new development projects and activities within the Laguna de Bay Region (LLDA BR No. 408, s. 2011).

 

 

Checklist of Requirements Where to Secure
  1. Duly accomplished  Online Application

 

http://llda.gov.ph/ / frontline desk of Clearances and Permits Division (CPD), 2nd  Floor, LLDA Building
  1. Clear scanned copy of Environmental Compliance Certificate OR Certificate of Non-Coverage, whichever is applicable. (Maximum file size of 3 MB in pdf, jpeg or png format)
DENR-EMB having jurisdiction on the matter http://ncr.emb.gov.ph/; http://calabarzon.emb.gov.ph/
  1. Clear scanned copy of SEC-approved Articles of Incorporation (for corporation) OR Articles of Cooperative duly approved by CDA (for cooperative) OR valid Certificate of Business Registration from the Department of Trade and Industry (for single proprietorship) or for LGU/Government Offices: Charter, SB File size (Maximum file size of 3 MB in pdf, jpeg or png format)

 

 

 

 

 

SEC / CDA / DTI

www.sec.gov.ph

www.cda.gov.ph; www.dti.gov.ph

 

 

 

 

 

 

  1. Clear scanned copy of Environmental Impact Assessment, Initial Environmental Examination, (Maximum file size of 3mb in pdf format) OR Project Description/Engineer’s Report (maximum of 1,800 words) whichever is applicable.
Applicant

 

  1. Clear scanned copy of Certification if the project is located within the shoreland barangays
4th Floor, LLDA Building, Shoreland Management Office
  1. Clear scanned copy or picture of Floor plan, signed by owner and licensed Architect or Civil (Maximum file size of 1mb in pdf, jpeg or png format)
Applicant

 

  1. Clear scanned copy or picture of Plant lay-out signed by owner and licensed Architect or Civil/ Chemical or Mechanical Engineer. (Maximum file size of 1mb in pdf, jpeg or png format)
Applicant

 

  1. Clear scanned copy or picture of Site development plan signed by owner and licensed Architect or Civil Engineer. (Maximum file size of 1mb in pdf, jpeg or png format)
Applicant

 

  1. Clear scanned copy or picture of Vicinity Map. Google Map is allowed. (Maximum    file size of 1mb in pdf, jpeg or png format)
Applicant

 

  1. Clear scaned copy of authorization letter to transact with LLDA

 

Representative

 

  1. Clear scanned copy of Endorsement letter and Inspection Report from PEZA if the company is a PEZA locator
PEZA

 

Client Steps LLDA Action Fees Processing Time Person Responsible
1.     None

 

 

 

 

 

 

 

 

1.    Within two (2) months after the  approval of the Conditional LLDA Clearance, schedules ocular inspection of the establishment

 

 

 

 

 

None

 

 

 

 

 

 

 

3 days

 

 

 

 

 

 

 

 

Engr. 3, Licensing Officer (LO) 3,

CPD, 2nd Floor

 

 

 

 

 

 

1.1  Conducts validation/ocular inspection

 

 

1 Day

 

 

Processor/Inspector (Engr. 1, 2, LO/Inspector 1,2), CPD, 2nd Floor

 

1.2  Evaluates submitted documents and prepares Inspection Report, Permanent LLDA Clearance and transmittal letter

 

None

 

 

 

5 Days

 

 

 

Processor/Inspector (Engr. 1, 2, LO/Inspector 1, 2), CPD, 2nd Floor

 

 

1.3 Endorses Inspection Report, Permanent LLDA Clearance and transmittal letter to the Division Chief/OIC for review None

 

 

1 Day

 

 

Processor/Inspector (Engr. 1, 2, LO/Inspector 1,2), CPD, 2nd Floor

 

1.4 Reviews application,   Inspection Report, supporting documents, Permanent LLDA  Clearance and transmittal letter

 

1.4.1 If in order, approves Inspection Report, and recommends approval of transmittal letter and Permanent LLDA Clearance

 

1.4.2 If not in order, return the same to the inspector/processor

 

Endorses to Department Manager for final review and approval

 

None

 

 

 

 

 

 

 

 

 

 

 

 

 

3 Days

 

 

 

 

 

 

 

 

 

 

 

 

 

Division Chief/OIC, CPD, 2nd Floor

 

 

 

 

 

 

 

 

 

 

 

 

1.5  Reviews Permanent LLDA Clearance and transmittal letter

 

1.5.1   If approved, recommends approval of permanent LC and endorses to OGM for approval

 

1.5.2   If disapproved, return to CPD for appropriate action

None

 

3 Days

 

Department  Manager, ERD, 2nd Floor
1.6 Reviews documents, transmittal letter and permanent LC

 

1.6.1    If in order, approves permanent LC

 

1.6.2    If not in order, return to ERD for appropriate action

 

None

 

 

 

 

 

 

 

3 Days

 

 

 

 

 

 

 

General Manager, OGM, 4th Floor

 

 

 

 

 

 

2.  Receives, download and prints permanent LC and transmittal  letter 1 Day

 

 

Total processing time (acceptance to approval) 20 working days

 

Fees:

Type of Fees Amount, in PHP
Processing Fee
LLDA Clearance 1,600.00
Regulatory Fee
A. Industrial Establishment/Infrastructure Projects/ Other Similar Projects
With  capital  investment of PHP 5 Million and below 1,800.00
More than PHP 5 Million 360.00 per Million
B. Agro-industrial establishment
B.1 Piggery  

1,000 heads or less

1,800.00

More than 1,000 heads

1.80 per head
B.2 Poultry Farm

7,000 birds or less

1,400.00

More than 7,000 birds

0.20 per bird
B.3 Duck Farm

2,800 ducks or less

1,400.00

More than 2,800 ducks

0.50 per duck
B.4 Cattle Farm

100 heads or less

1,400.00

More than 100 heads

14.00 per head
C. Housing and Development
C.1 Subdivision

10 has or less

1,800.00

More than 10 has

180.00 per ha
C.2 Townhouses, villas/other cluster housing units

20 units or less

1,800.00

More than 20 units

90.00 per unit
C.3 Condominium

1,000 sq.m floor area or less

1,800.00

More than 1,000 sq.m floor area

1.80 per sq. m.
C.4 Hotel/Motel

1,000  square meters  floor  area or less

1,800.00

More than 1,000 square meters floor area

1.80 per sq. m.
D. Institution
D.1 School

1,500  sq.m  floor  area or less

1,400.00

More than 1,500 sq.m floor area

1.20 per sq. m.
D.2 Hospital

1,000 sq.m floor area or less

1,800.00

More than 1,000 sq. m. floor area

1.80 per sq. m.
D.3 Memorial Park/Cemetery

10 has or less

1,800.00

More than 10 has

180.00 per ha
D.4. Wet and dry / market   (palengke)  

100 stalls or less

1,800.00

More than 100 stalls

18.00 per stall
D.5 Supermarket/shopping center, indoor recreation facilities, (gyms, cinema, etc) commercial establishments

1,000 sq.m floor area or less

1,800.00

More than 1,000 sq.m floor area

1.80 per sq. m.
D.6 Restaurant/fastfood

200 sq.m. floor area or less

1,800.00

More than 200 sq.m.

9.00 per sq. m.
E. Quarrying/Resource Extractive Industries

Less than P 5M (project cost)

1,800.00

More than P 5M

360 per Million
F.Industrial Subdivision

Less than P 5M (development cost)

1,800.00

More than P 5M

360 per Million
G. Theme Parks, Malls,Golf Courses 7.20 per sq. m.
H. Land Transport Terminals / Parking Areas

 50 vehicles or less

1,800.00

 More than 50 vehicles

36.00 per unit
I. Warehouse/Storage Facilities (hazardous waste)
     500 sq.m. floor area or less 1,800.00
     More than 500 sq. m. floor area 3.60 per sq. m.