A Memorandum of Agreement (MOA) was signed last August 14, 2018. The MOA was signed by LLDA, Winnergy Holdings Corporation and Municipality of Baras, Rizal.

The objective of the pilot project is to determine the viability / feasibility of establishing / constructing a floating solar farm on commercial level and effects on aquaculture and water quality. The beneficiary of the pilot project is the lamp posts lighting in the Park in Baras, Rizal.

The project is a 10-KW pilot project that is located in the Kasarinlan Eco Park in Baras, Rizal with an area not exceeding One Thousand Square Meters (1,000 sq. meters).

The Inauguration was held last September 27, 2018 in the Kasarinlan Eco Park, Baras, Rizal at around 6:30pm and was attended by stakeholders, LGU of Baras, Winnergy Holdings Corporation, Canadian Solar and LLDA.