Online Submission and Payment:
Download:
- DP Application Form
- List of Requirements
- Self-Monitoring Report (SMR) Form
- Approved DP Applications
- Clearances and Permits Verification
SCHEDULE OF AVAILABILITY OF SERVICE:
LLDA Office Hours
Mondays to Fridays: 7:30 a.m. to 5 p.m.
WHO MAY AVAIL OF THE SERVICE:
Persons, natural or juridical, who has the potential to discharge or discharging regulated effluent or liquid wastes located within the Laguna de Bay Region, whether new or existing development projects, installations and activities that are required to secure a Discharge Permit, pursuant to LLDA Board Resolution No. 322 series of 2007 or the Modified Wastewater Charge System in the Laguna de Bay Region.
MUST READ:
- MEMORANDUM CIRCULAR NO. 01-2019 – Guidelines on the imposition of daily penalty for the Discharging Pollutive Wastewater within the Laguna de Bay Region (LdBR), thereby superseding memorandum circular no. 3, series of 2012.
- MEMORANDUM CIRCULAR NO. 2017-05 – Rules and Regulations Implementing the New General Effluent Standards pursuant to LLDA Board Resolution No. 523, s. 2017, entitled “Adaption of DAO No. 2016-08 of the DENR as Effluent Standards for the Continuous Implementation of the EUFS and the Water Quality Guidelines for the Surface Waters within the Laguna de Bay Region and for Other Purposes.”
- MEMORANDUM CIRCULAR NO. 2017-01 – Guidelines in the processing of Applications for Discharge Permit Exemption.
- MEMORANDUM CIRCULAR NO. 2015-01 (AMENDING MEMORANDUM CIRCULAR No. 2014-03) – “Defining Refusal of Entry and Providing Sanctions Therefor”, Specifically Providing For Higher and Stricter Penalties for Violation Thereof.”
- MEMORANDUM CIRCULAR NO. 2014-08 – Policy and Procedural Guidelines for the Request and Conduct of Resampling and Other Purposes.
- MEMORANDUM CIRCULAR NO. 2014-09– Policy Guidelines for the Application of Temporary Acceptable Range.
- MEMORANDUM CIRCULAR NO. 2012-03 – Guidelines on the Imposition of the Daily Penalty of Ten Thousand Pesos (P10,000.00) for Discharging Pollutive Wastewater within the Laguna De Bay Region.
WHAT ARE THE REQUIREMENTS:
- Duly accomplished and notarized Application Form.
- Photocopy of LLDA Clearance.
- Water bills/readings for the last three (3) months registered in the name of the applicant.
- Water Treatment Facility and Drainage Plan layout, with complete specifications of the treatment process.
- Engineer’s Report/Technical Report, which includes the following information:
-
- The declaration of production capacity stating the quantity or volume and the generic name(s) of product, the nature and character of applicant’s waste, its chemical composition, total daily volume of discharge of raw waste, treatment process, and estimate treatment efficiency; and
- The total daily volume of water composition and discharge of finally treated waste or effluent
EXISTING FEES (as of July 2018)
1. Processing fee : PHP 5,000.00
2. Fixed fee : depending on the water volume, to wit:
a. Conventional Pollutants
-
-
- Small Scale, less than 30m3/day : PHP 8,000.00
- Medium Scale, 30 to 150m3/day : 16,000.00
- Large Scale, more than 150m3/day : 24,000.00
-
b. With Heavy Metals
-
-
- Medium Scale, 150m3/day or less : PHP 16,000.00
- Large Scale, more than 150m3/day : 24,000.00
-
3. Variable Fee (BOD and TSS as the EUF charging parameters)
-
- Within the effluent standards : PHP 5.00 per kg of BOD or TSS
- Exceeding the standards : PHP 30.00 per kg of BOD or TSS
HOW TO AVAIL THE SERVICE:
CLIENT |
LLDA |
|||
Step | Activity | Activity | Person Responsible | Duration |
1 |
Submits accomplished |
Evaluates accomplished |
CPD Staff |
30 minutes |
2 |
Proceeds to FD for the payment of corresponding fees. |
|
|
15 minutes |
3 |
Returns to CPD for submission of application form and proof of payment. |
Receives application form and proof of payment. |
CPD Staff |
15 minutes |
4 |
|
Schedules, and conducts inspection; and collects waste water samples |
SMD Staff |
1 working day |
5 |
|
Analyses samples and prepares ROLA. |
ELRD Staff |
10-15 working days |
6 |
|
Reviews and approves ROLA and transmits the same to SMD. |
Head, ELRD |
30 minutes |
7 |
|
Processes application for DP |
Case Handler |
1 working day |
8 |
|
Reviews application.
|
CPD Chief / ERD Manager |
30 minutes |
9 |
|
Approves DP / signs Notice of Denial. |
OGM / General Manager |
30 minutes |
10 |
Receives DP / Notice of Denial |
Releases approved DP / Notice of Denial. |
CPD Staff |
15 minutes |
PROCESSING PERIOD: 20 working days
Notes:
- The foregoing process applies to application with complete requirements and without pending case.
- Application forms are available for download (please see the top of this page) or at the frontline desk.
- In case of non-compliance to the applicable effluent standards, the results of evaluation shall be endorsed to the Enforcement Division for the preparation and issuance of Notice Of Violation (NOV). The NOV shall also state that the application is held in abeyance pending compliance with the effluent regulations.
- In the How to Avail the Service section, Duration refers to the time allotted for each activity, excluding queuing time. Processing Period refers to the time from the acceptance of duly accomplished application form up to the approval of the same, including queuing time.