ANGONO MATERIALS RECOVERY FACILITY WITH COMPOSTING

Print

Angono MRF

Municipality / Province : Angono, Rizal
Actual Project Cost : Php 7,000,000.00
Project Completion : 2009

The Angono Integrated Solid Waste Management Sub-project is designed to minimize the social and environmental problems caused by the increasing solid waste generation from the community. Estimated at nine metric tons per day in 2005, the volume is increasing rapidly along with the population. The sub-project aims to recover reusable and recyclable materials from collected municipal solid waste.

This includes:

1. Waste collection and segregation system
2. Compost - organic fertilizer plant
3. Plastic recycling center
4. Hollow block production plant

GALLERY

  • AngonoMRF1